Commission Regulation (EU) 2017/2196 of 24 November 2017 establishing a network code on electricity emergency and restorationText with EEA relevance.
32017R2196
European Union
§ Article 15
Article 15(5) to (8), Article 41 and Article 42(1), (2) and (5) shall apply from 18 December 2022.
This Regulation shall be binding in its entirety and directly applicable in all Member States.
Done at Brussels, 24 November 2017.
For the Commission
The President
Jean-Claude Juncker
Annex
ANNEX
Automatic low frequency demand disconnection scheme characteristics:
ParameterValues SA Continental EuropeValues SA NordicValues SA Great BritainValues SA IrelandMeasuring Unit
Demand disconnection starting mandatory level:
Frequency
4948,7 – 48,848,848,85Hz
Demand disconnection starting mandatory level:
Demand to be disconnected
5556% of the Total Load at national level
Demand disconnection final mandatory level:
Frequency
48484848,5Hz
Demand disconnection final mandatory level:
Cumulative Demand to be disconnected
45305060% of the Total Load at national levelImplementation range± 7± 10± 10± 7% of the Total Load at national level, for a given FrequencyMinimum number of steps to reach the final mandatory level6246Number of stepsMaximum Demand disconnection for each step10151012% of the Total Load at national level, for a given step